Overview
Quick Details
- Shape:
-
Spur
- Place of Origin:
-
Zhejiang, China
- Brand Name:
-
EPT
- Model Number:
-
OEM
- Material:
-
PP,PS,PET,POM,ABS,NYLON,PA66, plastic
- Mold produce time:
-
one month
- plastic of origin:
-
Jiangsu
- Mold lifetime:
-
500,000 shots
- specification:
-
customized per drawing
- production time:
-
4 weeks
- Enineering software:
-
soldworks,UG,ProE,CAD
- Processing way:
-
injection
- Module:
-
0.2.0.3.0.5,1,1.2,1.5.2
Supply Ability
- Supply Ability:
- 30000 Piece/Pieces per Week
Packaging & Delivery
- Packaging Details
- custom design free long lifetime and packed in wrap-carton-wooden pallet or as per requesiton
- Port
- SHANGHAI OF CHINA
-
Lead Time
: - Shipped in 15 days after payment
Online Customization
Product Description
We manufacture:spiral bevel gears ,electric tool gears,electric tool pinion, electronic tool gear,electronic tool pinion for OEM customers.
At same times ,we can produce as per your drawing or sample,long term cooperation is appreciated.if you want to know details, please feel
Product Name |
MMS factory small plastic helical gear with 7,8,13 ,24,32teeth and 0.2,0.3, 0.4 ,1 ,1.5 module for gear moto |
Material |
PP,PS,PET,POM,ABS,NYLON,PA66. |
Color |
true color |
Standard |
DIN GB ISO JIS BA ANSI |
Machinning |
Injection /CNC |
LBrade |
MIMISI |
Manufacture |
China |
Used |
industry machinery |
Products Show
Descriptiom
Design software:
UG, Pro/E, Solidworks, CAD
Mold build capability:
Up to 60sets/month
Clamp forces:
75Ton~450Ton
Raw Material:
PP, PA, PA66, POM, PA6+GF, PC, PC/ABS, ABS, PMMA, PE, TPE, etc.
Mold Base:
LKM, S50C
Mold Insert:
738, 718, 718H, P20, NAK80, S136, S136H, 420
Runner Type:
Cold runner, hot runner(YUDO/HASCO)
Gate Type:
Pin point gate, side gate, slim gate, tunnel gate, direct gate
Appearance finished
EDM, High polish; Mirror polishing, Texture/Graining
Hardness of steel
52±2 HRC
Mold Life
More than 1,000,000 shots
Our Company
Factory
Our Factory
CNC dept
Our CNC dept
Milling dept
Our Milling dept
Boring processing dept
Our Boring processing dept
Packing & Delivery
10-15 days after receiving despoit as per the negotiation along buyer and sellercomprehensive style of transportation saving your cost.
Features
Inspection :all items are checked and tested thoroughly during every working procedure to ensure
best quality products goes out to the global market .
durable in use and great wear resistance
top quality with competitive price
inner plastic bag then carton box and then wooden case or as per your requestion
timely delivery or as per customer’s request
long life span and easy to install
OEM or ODM welcome
specialize in standard and nonstandard chain and sprocket ,so we can produce all kinds of chain and sprockets according to customer’s drawing and specifications and sample.
Our Service
specialize in standard and nonstandard chain and sprocket ,so we can produce all kinds of chain and sprockets according to customer’s drawing and specifications and sample.
FAQ
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below:
….